Verify program, tools, offsets, workholding and clearances before the first run.
A first-run checklist supports the machine-specific proving procedure. It cannot certify a program as collision-free or replace a trained operator and an approved setup.
Confirm the program and references
Identify the approved program revision, machine and control. Check units, active plane, absolute or incremental positioning, feed mode, spindle direction and limits, tool calls, offsets and work coordinate system. Verify the meaning of commands in that control manual; familiar code numbers are not sufficient evidence.
Confirm the physical setup
Check workholding, jaw projection, supports, tool clearance, overhang and the full path including tool changes and returns. Compare actual stock and fixtures with the setup model. Verify tool geometry and wear offsets separately from the work zero. Remove loose objects and close guards as required.
Prove the path by the approved method
Use simulation or graphics with correct setup data before the authorized machine proving sequence. Simulation does not prove that the real setup matches the model. Single block, dry run and feed or rapid overrides behave differently across controls and cycles; use them only as specified. Never bypass guards or unexplained alarms.
Stop, inspect and release
Stop before an uncertain movement and resolve its cause. Measure the first component using the quality plan; document critical dimensions, results and program revision before releasing the batch. If the setup or program changes, repeat the required checks. A successful first part does not remove subsequent inspection requirements.