← Back

Drilling · 9 min

Deep drilling: coolant and chip evacuation

Control entry, coolant supply and chip evacuation in deep drilling.

Control entry, coolant supply and chip evacuation in deep drilling.

As the depth-to-diameter ratio increases, guidance and chip evacuation become critical. A 120 mm hole made with a 10 mm drill has a ratio of 12×D; that arithmetic does not prove that a particular drill or machine can produce it.

Prepare the entry and setup

Identify the drill family, permitted depth and material. Check runout, holder cleanliness, alignment, unsupported length and clamping. Prepare the entry face and any pilot hole exactly as specified for that tool. A spot drill or pilot diameter suitable for another drill may be unsuitable here.

Verify fluid at the cutting zone

Check the specified pressure, flow, filtration and fluid condition. Pressure at the pump does not prove that fluid reaches the cutting edges: passages, filters, seals and connections can restrict delivery. Through-tool supply can assist evacuation when the tool is designed for it; there is no universal pressure value for every diameter and depth.

Choose the cycle from the tool instructions

Do not apply a full-retraction pecking cycle to every carbide drill. Continuous feed, chip-breaking moves, pilot entry and withdrawal depend on the drill design and approved process. Check the control manual for the exact canned-cycle behavior. Never improvise a restart with a damaged drill or packed chips.

Observe and record

Unexpected load increases, noise or irregular chips require assessment under the workshop stopping procedure. After stopping and isolating the machine as required, inspect the tool and fluid path; never reach for chips while parts move. Record drill reference, material, depth/diameter, fluid conditions and findings before changing one approved variable at a time.

ISCAR · Drilling Handbook · 303